Technical Due Diligence Checklist: 8 Areas to Prepare Before a Buyer or Investor Looks
A seller's technical due diligence checklist covers eight areas to prepare before a buyer or investor looks: the deal context, your technology assets, code, architecture and infrastructure, security and data, the team and key-person risk, IP and third-party licenses, the red flags you already know about, and your plan to fix them. If you are the seller, the best time to work through it is before the diligence request arrives, while you still have time to fix what you find.
This guide gives you the eight areas, what to prepare in each, and a data room list you can copy. It is written for the founder, CEO or CTO of the company being reviewed.
Who needs a technical due diligence checklist?
- A founder preparing to sell, or expecting an acquisition conversation in the coming months.
- A CEO raising a round where investors will review the technology.
- A CTO or engineering lead asked to answer a buyer's technical questionnaire.
What should you prepare? The 8 areas
Print this section on its own. Each area has one line on what "ready" looks like, and the data room list below has the evidence for each. If you are starting now, do areas 7 and 8 first, then work through 1 to 6.
1. What is the deal context and the buyer's lens?
Ready when: you can say in a paragraph why this buyer, or the kind of buyer you expect, wants the technology (the product, the team, the customers or the data) and which of the areas below will matter most to them.
2. What technology assets do you have?
Ready when: you have a current list of your products, codebases, environments, hosted services, domains and the third-party services you depend on, each with an owner.
3. Can the code, architecture and infrastructure scale?
Ready when: you have a current architecture diagram, a short written description of how the system works, its known limits, the parts that would need work to handle much more load, and a description of how code gets to production (build, test, release and monitoring).
4. What is your security, compliance and data posture?
Ready when: you can show how staff and customers sign in and who can reach what, how customer data is encrypted in transit and at rest, how you find and fix vulnerabilities, how you handle incidents, and where customer data lives. The NIST Cybersecurity Framework 2.0 is one widely used structure for this. Its core is organized around six functions: Govern, Identify, Protect, Detect, Respond and Recover. (NIST: CSF 2.0 release) Mapping what you do to those six headings is one way to look for gaps.
5. Is there team, key-person or knowledge risk?
Ready when: you know which systems only one person understands, what is documented and what is not, and how you would cover each key person's absence.
6. What is your IP, licensing and third-party exposure?
Ready when: you can show that the company owns the code its people wrote, and you have a list of the open source components you use with their licenses. The SPDX License List gives a standard short identifier for each common open source license, which keeps that list consistent. (SPDX License List) Have counsel review any license that places conditions on how you distribute your software, or on letting users reach it over a network, as the GNU Affero General Public License does. (SPDX: AGPL-3.0-or-later)
7. What red flags do you already know about?
Ready when: you have written down every known problem (unsupported software versions, untested backups, missing documentation, a module nobody owns) and what each one could cost the deal if a buyer finds it first.
8. What is your remediation plan?
Ready when: each red flag has a fix, an owner and a date, ranked by what matters most to this buyer, and the evidence for each area sits in the data room.
What goes in the technology data room?
Copy this list and check items off as you add them.
Assets, code and architecture (areas 2 and 3)
- Architecture diagram, data flow diagram and system description
- Asset inventory: products, codebases, environments, hosted services, domains
- List of third-party services and the contracts behind them
- Build, test and release process, and test coverage for the critical paths
- Monitoring and alerting setup, and the incident history
- Hosting cost summary, and what drives it as load grows
- API documentation, if you offer an API
- Backup and recovery procedure, and the date it was last tested
Security and data (area 4)
- Security policies, the incident log and the incident response procedure
- Production access list, and the steps for removing access when someone leaves
- Latest penetration test or vulnerability scan, and what was fixed
- Any SOC 2 or similar report, or a plain statement that you have none
- Description of where customer data is stored and who can access it
- Compliance status for the rules that apply to you (for example GDPR)
Team (area 5)
- Engineering team chart, with key-person risks noted
IP and licenses (area 6)
- Signed records showing the company owns code written by employees and contractors
- Open source component list with license identifiers, built from a dependency scan of each codebase rather than by hand
- Patent and trademark status
Red flags and plan (areas 7 and 8)
- Technology roadmap and the known technical debt list
- The red flag register and remediation plan
Give each item an owner and the date it was last updated.
How early should a seller start?
As early as you can. Some fixes, such as replacing unsupported software or documenting a system only one person knows, can take longer than the diligence window. Start with areas 7 and 8: list the red flags, then decide which ones you can fix before the buyer looks and which ones you will explain. A simple order: list the red flags, fix what you can and write a short explanation for the rest, assemble the data room, then rehearse the buyer's likely questions with the people who will answer them.
What seller mistakes should you avoid?
- Letting the buyer find the problem first. If you disclose a red flag with a fix plan, you frame it; if the buyer finds it first, they frame it.
- An out-of-date architecture diagram. If the diagram does not match the system, the buyer has reason to question the rest of the pack.
- No open source license list. It is slow to build under deadline.
- Unclear ownership of code. Without signed records for contractors' work, ownership of that code is open to question.
- Treating the checklist as paperwork. The buyer is asking whether the technology can do what the deal assumes. Answer that question.
Related guide: Build vs Buy Software: A Decision Framework and Template
Frequently asked questions
What is technical due diligence?
A review a buyer or investor runs on a company's technology before a deal. It looks at what the technology is, whether it can do what the deal assumes, what risks it carries, and what it would cost to fix them.
What is the difference between technical and financial due diligence?
Financial due diligence checks the numbers: revenue, costs, cash and liabilities. Technical due diligence checks the technology behind them: the code, the architecture, security, the team and the IP.
How long does technical due diligence take?
It depends on the deal and the buyer. Preparation is what you control: the more of the data room list above is ready before the request arrives, the less time the review spends waiting on you.
Should a seller run its own technical due diligence?
It helps. A self-review against the eight areas shows you the red flags while you still have time to fix them or prepare an explanation.
Prepare the pack faster
The Technical Due Diligence Pack agent in The Fractional CTO drafts an eight-section pack from what you enter in a short intake: diligence context and buyer lens; technology asset summary; code, architecture and scalability findings; security, compliance and data posture; team, key-person and knowledge risk; IP, licensing and third-party exposure; a red flag register with the commercial consequence of each; and a remediation plan with a data room checklist. It works from what you tell it, so the evidence itself is still yours to gather and check. Treat what it produces as a first draft, and have a qualified engineer or advisor review it before you act, especially on security and diligence findings.
See The Fractional CTO →This guide describes a preparation structure. Have a qualified engineer or advisor review your findings, and counsel review IP and licensing questions. It is not legal or professional advice.